Five Guys Franchise Opening Costs and Price Guide 2026

This guide summarizes typical costs and price ranges to open a Five Guys franchise in the United States. Buyers should expect major cost drivers to be site selection, build-out, equipment, and initial working capital. The article presents cost ranges in USD, with per-unit and total estimates to aid budgeting and financing decisions.

Item Low Average High Notes
Franchise Fee $0 $0–$25,000 $25,000 Varies by program and region
Initial Build-Out (construction) $150,000 $350,000–$1,000,000 $1,000,000 Includes site design, permits, furniture
Kitchen Equipment $100,000 $250,000–$500,000 $600,000 Range, fryers, hood, refrigeration
Planning & Permits $5,000 $30,000–$100,000 $120,000 Local codes, inspections
Initial Inventory & Training $20,000 $40,000–$80,000 $100,000 Food, packaging, uniforms
Working Capital $50,000 $100,000–$200,000 $300,000 First 3–6 months
Marketing & Grand Opening $10,000 $25,000–$75,000 $100,000 Local promotions, signage
Totals (Typical Range) $335,000 $795,000–$1,955,000 $2,240,000 Assumes mid-size site and standard build-out

Overview Of Costs

Cost ranges for opening a Five Guys franchise in the U.S. generally span from the mid six-figures to well into seven figures, with total investment highly dependent on location, restaurant size, and construction conditions. Typical per-unit costs include build-out, equipment, and working capital necessary before reaching break-even. Factors like urban site premiums, land cost, and local labor rates can push totals higher or lower.

Cost Breakdown

Table below shows key cost categories with rough ranges and assumptions. The figures assume a standard full-service Five Guys style store in a mid-range market, with 1,800–2,400 square feet, and a normal permitting context. Totals include both one-time upfront costs and initial reserves.

Category Low Average High Assumptions Notes
Materials $60,000 $120,000 $260,000 Fixtures, cabinetry, counters Construction materials for build-out
Labor $70,000 $150,000 $350,000 Contractors, carpenters, installers Includes supervision
Equipment $100,000 $250,000 $520,000 Kitchen, refrigeration, POS Major investment area
Permits $5,000 $25,000 $100,000 Local building, health, signage Possibly higher in dense cities
Delivery/Disposal $5,000 $15,000 $40,000 Waste removal, equipment delivery Initial setup phase
Contingency $20,000 $60,000 $150,000 10–15% of total Budget cushion

Assumptions: region, site size, specs, labor hours.

What Drives Price

Site size and layout are the largest determinants of build-out costs, influencing both materials and labor. Urban, high-rent markets typically incur higher tenant improvements and permitting fees. data-formula=”labor_hours × hourly_rate”> Labor rates vary by city and contractor availability, with skilled trades often commanding premium in busy markets.

Regional Price Differences

Prices differ across regions due to real estate, labor, and permitting norms. In this section, costs are shown as regional deltas to help align budgeting with local market realities.

Urban vs Suburban vs Rural

Urban centers often have higher build-out and permit costs (+10% to +40% vs suburban) and elevated rent. Suburban locations generally offer lower construction costs and faster permitting. Rural sites may present the lowest initial costs but can incur longer supply lead times and marketing challenges.

Real-World Pricing Examples

Three scenario cards illustrate how costs can vary with scope and site. All figures are hypothetical ranges and assume a standard 2,000 sq ft footprint in a mid-market metro.

Basic Scenario

Specs: 2,000 sq ft, standard build-out, mid-range equipment package. Labor hours: 1,100; Materials: mid-range; Permits: standard.

Estimated total: $450,000–$700,000. Margin notes: simpler interior, fewer premium finishes; planned contingencies at 10–15%.

Mid-Range Scenario

Specs: 2,000–2,200 sq ft, enhanced equipment, moderate site improvements. Labor hours: 1,500; Materials: diverse; Permits: typical.

Estimated total: $700,000–$1,100,000. Notes: standard landlord improvements included; marketing budget on the higher end.

Premium Scenario

Specs: 2,400 sq ft, premium finishes, full-service kitchen upgrades, signage package. Labor hours: 1,800; Materials: high-end; Permits: complex.

Estimated total: $1,150,000–$2,000,000. Notes: urban prime location; additional security and technology features add cost.

Cost Drivers & Pricing Variables

Franchise term and support vary; some networks offer assistance with site selection, training, and marketing, which can reduce risk but not always lower upfront cash. Startup financing may influence perceived affordability, with lenders evaluating site quality, projected sales, and working capital needs. The timeline from signing to opening typically spans several months and depends on permitting backlogs and contractor availability.

Price By Region

Three regional contrasts highlight typical deltas for the opening investment.

West Coast

Higher permitting and labor costs can push totals toward the upper end of the ranges, with urban cores reaching the top end of the spectrum.

Midwest

Balanced costs in mid-sized markets; build-out and equipment generally fall within the average ranges, with strong supplier competition helping to control materials.

South & Southeast

Often among the lower to average cost ranges due to lower real estate prices and steady labor rates, though urban centers may differ.

Cost Compared To Alternatives

Franchise vs independent concepts show that franchising often entails higher upfront fees but provides brand recognition, training, and operational support that can shorten the path to profitability. Independent burger concepts may require more upfront marketing spend and longer brand-building efforts but can avoid recurring franchise fees.

Maintenance & Ownership Costs

After opening, ongoing costs include maintenance, insurance, utilities, and periodic equipment replacement. The five-year cost outlook typically adds up to a meaningful amount beyond the initial investment, influenced by equipment durability and energy efficiency.

Savings Playbook

Ways To Save include negotiating lease terms, selecting standard equipment packages, leveraging bulk purchasing for initial inventory, and timing store openings to exploit off-peak permitting or promotional windows. A well-structured financing plan can reduce upfront cash needs while keeping debt service manageable in the first year.

Permits, Codes & Rebates

Local rules and potential incentives may reduce net cost. Investigate building, health, and fire code requirements, as well as any local economic development rebates or tax incentives available for new restaurants. Proper planning can reduce delays and cost overruns.